Matte-black 40-yard roll-off dumpster staged on a framed-out residential construction site in Hollywood, framing lumber stacked nearby, hooklift delivery truck visible in the background under bright Colorado daylight

Construction dumpster rental in Hollywood

Need a roll-off fast? Use a 20-yard for remodels or a 30-yard for full teardowns with dispatcher-scheduled swap-outs.

Jobsite Roll-off Containers for General Contractors

Our construction fleet deploys 20-, 30-, and 40-yard roll-offs across Hollywood and Broward; these containers feature reinforced steel sidewalls, walk-in rear swing doors, and steel bottom rollers for framers, roofers, and demo crews. We set every bin on protective driveway boards. For multi-phase projects, we manage recurring hauling agreements with contractor pricing and tonnage rates to keep your site moving.

Matte-black 20-yard roll-off construction dumpster with heavy ribbed steel sidewalls and swing rear doors at a working jobsite in Hollywood, sitting directly on compacted dirt with an unmarked white hauler partially visible at the far edge of the frame.

20-yard construction roll-off

The 20-yard roll-off measures 20 feet long, 7 feet wide and stands 4 feet tall, with about 2 tons included.

Our 20-yard roll-off serves kitchen and bath remodels, single-room demo, and small framing jobs in tight spaces.

Matte-black 30-yard roll-off construction dumpster sitting directly on the compacted-dirt site of a framed single-family home build in Hollywood, drywall and lumber scrap loaded inside.

30-yard construction roll-off

The 30-yard roll-off runs 22 feet long, 8 feet wide, and 6 feet tall, with about 4 tons included for your debris.

The 30-yard container handles whole-house remodels, additions, and new-build framing with high walls for bulky drywall and lumber.

Matte-black 40-yard roll-off construction dumpster being lowered from a white-cab hooklift delivery truck onto the compacted-dirt jobsite at a commercial build site in Hollywood

40-yard construction roll-off

The 40-yard roll-off stretches 22 feet long, 8 feet wide, and 8 feet tall, with about 5 tons of debris included.

Sized for commercial builds and large tear-outs, the 40-yard container is the largest roll-off we stage at active sites.

Construction Debris, Drywall, Lumber Acceptance

Our construction roll-off containers accept the full range of mixed C&D debris: framing lumber, drywall, plaster, subfloor, insulation, packaging, pallets, and light metals. These materials are sorted at the Hollywood transfer station to maximize recovery — and contractors often manage their sites by using commercial recurring hauling agreements. We also follow EPA construction debris recycling guidance to ensure every container is handled properly.

  • Framing lumber and offcuts
  • Drywall, plaster, lath
  • Subfloor and sheathing
  • Insulation and vapor barrier
  • Mixed packaging and pallets
  • Light metals and conduit
Worker in a yellow high-visibility vest tossing framing lumber and broken drywall into a matte-black 30-yard construction roll-off dumpster on an active build site in Hollywood, bright daylight
Low-profile matte-black lowboy roll-off dumpster loaded with broken concrete slab and rebar at a foundation tear-out in Hollywood, skid steer parked beside it, sunny Colorado morning

Concrete, Brick, and Asphalt Heavy-debris Pricing

Dense materials need a heavier-duty container than standard bins. Our reinforced-steel lowboy roll-offs handle concrete slab tear-out, brick demo, asphalt millings, and clean dirt loads up to 10,000 pounds per load. The low 2-to-3-foot side walls let a skid steer or wheelbarrow roll debris straight in without busting USDOT truck weight limits on Hollywood routes.

Heavy-debris jobs run on a weight ticket from the scale house, not by the yard; the cleanest loads—strictly concrete or dirt with no mixed wood, drywall, or trash—earn the lowest per-ton rate, and the rest are billed by the total tonnage for that container. I dispatch the dumpster after talking to the site super.

Tonnage Limits and Weight Overage Policy

Each construction roll-off includes a set tonnage allowance: any additional weight is billed at our per-ton overage rate against the scale-house ticket. We list this cap on your upfront quote so there are no surprises when the container weighs in; meanwhile, we suggest specific roofing tear-off jobsite containers—shingle weight runs heavy, so keep that separate to protect your standard mixed-debris allowance.

20-yard

3 tons

Included tonnage. Mixed C&D debris.

30-yard

4 tons

Included tonnage. Mixed C&D debris.

40-yard

5 tons

Included tonnage. Mixed C&D debris.

On-site Swap-out and Dispatch Coordination

Multi-week jobs run on a swap rhythm, not single drops; text or call dispatch when a container is full — we roll a fresh roll-off to the same staging pad on the same or next business day across the Hollywood metro and Broward.

Step 1

Text dispatch when full

Site supers text a photo of the container plus its number to the dispatcher — no portal logins, no ticketing.

Step 2

Same- or next-day swap

We haul a full container and drop an empty one on the same staging pad so loading hours never slip.

Step 3

Weekend dispatch available

Saturday pulls keep Monday starts clean; Friday afternoon coordination closes the gap.

Insurance and Contractor Account Setup

For Hollywood contractors and owners, we issue Certificates of Insurance and run Net-30 accounts with consolidated monthly billing; the hooklift fleet stages recurring bins across active sites — and the account opens with a single phone call to dispatch.